Mine Planning and Engineering Design

A mine is a production system. We coordinate the extraction method, underground workings, material flows and supporting infrastructure around the deposit and the required output.

Scope of work

  • Review of geological information, existing mine plans, production requirements and infrastructure constraints; preparation of the engineering brief.
  • Selection and justification of mining methods, mine access and development layouts, reserve extraction sequences and production schedules.
  • Mine haulage, hoisting, loading and transfer facilities, and backfill systems matched to the mining method and production capacity.
  • Mine ventilation and intake air heating, dewatering, power supply, automation and the interfaces between underground and surface facilities.
  • Mine development plans, revisions and additions, including technical projects prepared for review by Russia's mineral resources authorities.
  • Coordinated design of buildings, structures and utilities, followed by detailed design and equipment specifications for the agreed scope.
  • Operating requirements, industrial safety justifications and design support during construction, where included in the assignment.

What we deliver

  • Mine development plans and engineering reports explaining the selected mining method and infrastructure requirements.
  • Coordinated design documentation for the underground and surface facilities within the agreed assignment.
  • Detailed drawings, equipment specifications and design clarifications for implementation.

For an international assignment, we agree on the deliverables and applicable design requirements with the client and, where needed, the local engineering partner.

Relevant project experience

Talitsky potash mine site under construction in spring 2025

Potash mining · 2025

Acron Engineering / Talitsky Potash Mine

Addendum No. 3 to the mine development design for the Talitsky block of the Verkhnekamsk potassium and magnesium salt deposit. The documentation was approved by Rosnedra's project review commission (CKR).

Mine development design — Addendum No. 3

Explore project →
Underground working at the Kamsko-Ustinsky Gypsum Mine

Industrial minerals · 2025

Kamsko-Ustinsky Gypsum Mine

Mine development design for gypsum extraction at an operating underground mine. The documentation was approved by Rosnedra's project review commission (CKR), and the client provided a favorable reference.

Mine development design

Explore project →

Start a conversation

Discuss your engineering project

Tell us about your facility, its location, the current project stage and the work you need. You can send an existing engineering brief or start with a short description; we will help identify the required inputs and define the assignment.

Discuss your project