Acron Engineering / Talitsky Potash Mine: Addendum No. 3 to the potash mine development design
Addendum No. 3 to the mine development design for the Talitsky block of the Verkhnekamsk potassium and magnesium salt deposit. The documentation was approved by Rosnedra's project review commission (CKR).
- Client
- Acron Engineering
- Facility owner
- Verkhnekamsk Potash Company
- Location
- Perm Krai, Russia
- Stage presented
- Mine development design — Addendum No. 3
- Year
- 2025
- Result
- Approved by Rosnedra's project review commission (CKR)

The engineering task
Develop Addendum No. 3 to the technical design for extraction of potash reserves in the Talitsky block of the Verkhnekamsk deposit.
Our work
- Developed Addendum No. 3 to the mine development design.
- Prepared the documentation for review by Rosnedra's Central Commission for mineral development project review (CKR).
Completed result
Addendum No. 3 was approved by the CKR under protocol No. 456/25-stp dated October 21, 2025. The protocol identifies GPITS as the documentation developer.
Start a conversation
Discuss your engineering project
Tell us about your facility, its location, the current project stage and the work you need. You can send an existing engineering brief or start with a short description; we will help identify the required inputs and define the assignment.