Kamsko-Ustinsky Gypsum Mine: Underground gypsum mine development design
Mine development design for gypsum extraction at an operating underground mine. The documentation was approved by Rosnedra's project review commission (CKR), and the client provided a favorable reference.
- Client
- Kamsko-Ustinsky Gypsum Mine JSC
- Facility owner
- Kamsko-Ustinsky Gypsum Mine
- Location
- Republic of Tatarstan, Russia
- Stage presented
- Mine development design
- Year
- 2025
- Result
- Approved by Rosnedra's project review commission (CKR)

The engineering task
Prepare the mine development design for the Kamsko-Ustinsky gypsum deposit, accounting for the requirements of the operating underground mine.
Our work
- Developed the mine development design for the gypsum deposit.
- Prepared the documentation for review by Rosnedra's Central Commission for mineral development project review (CKR).
Completed result
The mine development design was endorsed by Rosnedra's project review commission (CKR). Protocol No. 289/25-stp is dated July 8, 2025, and was approved on July 15. The client issued a favorable reference on August 14, 2025.