Industrial Facility Design and Modernization

We connect the production process with buildings, structures, equipment and utilities. For operating facilities, the design also accounts for existing systems, connections and site constraints.

Scope of work

  • Review of the engineering brief, site surveys, existing documentation, process requirements and utility connection conditions.
  • Coordinated design documentation for new industrial facilities and the reconstruction of existing buildings and infrastructure.
  • Process, architectural and structural design of production, administrative and support buildings and other industrial structures.
  • Water supply and treatment, drainage, HVAC, power supply, automation, communications and fire protection, as required by the facility scope.
  • Modernization of process systems and integration of replacement or additional equipment into an operating facility.
  • Detailed design, coordination of interfaces between engineering disciplines, and design support during construction.
  • Preparation of responses and design revisions during the applicable project review process.
  • Engineering systems and auxiliary infrastructure for nuclear power plants, drawing on our licensed project experience in Russia.

What we deliver

  • A coordinated design package covering the agreed process, structural and utility systems.
  • Detailed drawings, equipment specifications and connection arrangements for construction or modernization.
  • Technical responses and revisions during review, followed by design clarifications during implementation where commissioned.

Relevant project experience

Zvezda Shipbuilding Complex in Bolshoy Kamen, with ships, docks and gantry cranes

Official Zvezda Shipbuilding Complex website. Source.

Industrial buildings · 2026

Zvezda Shipbuilding Complex

Design documentation for a transport workshop within the Zvezda Shipbuilding Complex, with support through the review process and a positive state construction expert review conclusion.

Design documentation for the transport workshop

Explore project →
Beloyarsk Nuclear Power Plant units beside an autumn forest

Alexandra Zolotova / Wikimedia Commons. Source. CC BY-SA 4.0.

Nuclear power infrastructure · 2025

Beloyarsk Nuclear Power Plant

Design documentation for changes to the KTS-4 water-treatment process, including dismantling and preservation of selected chemical water-treatment systems and equipment. The documentation received a positive industrial safety expert review.

Detailed design documentation

Explore project →

Start a conversation

Discuss your engineering project

Tell us about your facility, its location, the current project stage and the work you need. You can send an existing engineering brief or start with a short description; we will help identify the required inputs and define the assignment.

Discuss your project