Beloyarsk Nuclear Power Plant: KTS-4 water-treatment plant modernization
Design documentation for changes to the KTS-4 water-treatment process, including dismantling and preservation of selected chemical water-treatment systems and equipment. The documentation received a positive industrial safety expert review.
- Client
- Rosenergoatom Concern JSC
- Facility owner
- Beloyarsk Nuclear Power Plant
- Location
- Sverdlovsk Region, Russia
- Stage presented
- Detailed design documentation
- Year
- 2025
- Result
- Positive industrial safety expert review

The engineering task
Prepare the documentation for technical modernization of the KTS-4 water-treatment facility at Beloyarsk Nuclear Power Plant, addressing changes to its process flow scheme.
Our work
- Prepared the documentation for technical modernization of the water-treatment facility.
- Developed solutions for dismantling and preserving selected chemical water-treatment systems and equipment.
- Prepared the process engineering solutions and associated engineering requirements.
Completed result
The documentation received positive industrial safety expert review report No. 083-EPD/2025/1709 and was found to comply with the applicable industrial safety requirements.
Start a conversation
Discuss your engineering project
Tell us about your facility, its location, the current project stage and the work you need. You can send an existing engineering brief or start with a short description; we will help identify the required inputs and define the assignment.